Search

Brand New Look at Sheung Shui Campus

HKIC - Sheung Shui campus is under renovation and will be completed in academic year 20/21. Full-time students enrolled in this academic year (20/21) can enjoy fully upgraded campus facilities and more spacious and comfortable environment for student activities, so as to enrich their campus life for better holistic development.

The newly renovated campus will have 15 classrooms, workshops for various trades, assembly hall, learning resource centre, multi-purpose room, language lab, gym and student cafeteria.

Workshops

The campus is equipped with state-of-the-art workshops to match different training discipline. These include bricklaying, plastering and tiling; plumbing and pipe-fitting; electrical installation; painting, decorating and sign-writing, carpentry and joinery and welding.

Assembly Hall

The Assembly Hall is suitable for various sports activities, including badminton, basketball, 5-a-side football, archery and rowing.

Learning Resources Centre Student Cafeteria

The Learning Resources Centre has a wide range of collection that is conducive for students to self-study and leisure reading.

The student cafeteria offers affordable but good quality dining options.

Classrooms Multi-purpose Room

The classrooms are equipped with modern teaching facilities and stylish design to optimise learning experience.

The multi-purpose room can accommodate 100 people for lectures and seminars.

*Pictures are for reference only.

Search Course
Back to Top
All
Full-time
Part-time
1Interest
2Place
3Period
Step 1: Interest
Select your range of interest
Building
Civil Engineering
Electrical & Mechanical
Safety & Health
Project Management
IT-related
Environment Protection & Heritage
Others
Course Searching by Construction Idiom (Chinese only)
釘板
落石屎
紮鐵
金工/鐵器
平水/墨斗
燒桿
水電
Other
Back
Skip